Capability Statement:

Geotechnical & Geo-Environmental Engineering

Introduction

Burrows Graham is an engineering consultancy, established in January 2020.

Our team has three decades of experience in the UK construction industry providing design and advisory services to developers, building occupiers and contractors across a range of sectors, specialising in industrial and logistics buildings and associated infrastructure.

We fully understand the needs of our clients in relation to quality, commercial viability, timescales and sustainability, and the significant majority of our work is gained through repeat business, demonstrating the value we bring to the projects we help to deliver.

In 2025, Burrows Graham began expanding its Geotechnical and Geo-Environmental expertise and now has a dedicated Geo Team of highly qualified Engineers with the senior staff having a combined total of 90 years industry experience.

Organisation Structure

The company employs a team of circa 60 staff, including highly experienced engineers and technicians, based in the head office in Altrincham, South Manchester and in the Southern Office in Berkhamsted. The Geo Team is split 50:50 across the two offices.

Geo Team Services

The Geo Team work alongside the civil and structural engineering teams to provide advice regarding the ground conditions in relation to issues such as contamination, ground gases and structural elements such as foundation and floor slab solutions and the design and stability of slopes and retaining walls.
The Geo Teams expertise covers all stages of development from Desk Study Appraisals to site investigations to the design, supervision and validation of the construction works.

Site Appraisals
• Ground conditions, topography, geotechnical and contamination hazards
• Commercial and delivery/programme risks

Planning Application Support
• Phase 1 desk studies and preliminary risk assessment
• Coal Mining Risk Assessment and Mineral Resource Assessment

Geotechnical and Geo-Environmental Engineering Design and Advisory Services
• Phase 2 ground investigation and interpretive reporting
• Geotechnical and geo-environmental risk assessment and options appraisal
• Geotechnical design and specification of earthworks, ground improvement, structural foundations and slabs, slopes and retaining walls using the latest design software
• Development of remediation strategies and verification plans for brownfield and contaminated sites
• Preparing and managing Materials Management Plans and ensuring compliance with waste regulations

Construction Phase Support Services
• Regular site attendance, watching briefs and site inspections
• Validation and verification

Experience

The enclosed case studies show key examples of our current projects and previous experience.
Our client list includes:

  • DHL

  • GLP

  • Baytree Logistics

  • Bericote

  • Panattoni

  • SEGRO

  • Goodman

  • ProLogis

  • Bridge Industrial

  • UPS

  • Tritax Symmetry

  • IM Marchmont

  • Savills Investment Management

  • PLP

  • Graftongate

  • Goodman

  • IM Properties

  • LCP

  • BMW

  • CBRE

  • Indurent

  • DP World

Key Personnel

CVs for our Key Personnel can be provided on request.

Geotechnical & Geo-enviromental
Baytree  Nuneaton

Baytree Nuneaton

Baytree NuneatonBaytree NuneatonBurrows Graham provided geotechnical advice and design services in connection with this 1m sq ft project, comprising two warehousing units. One of the development plots is situated over a former landfill. The building and part of the...

read more
GLP – Magna Park Corby

GLP – Magna Park Corby

GLP - Magna Park CorbyMagna Park CorbyBurrows Graham has provided geotechnical design input and advice for development of warehouse buildings at Magna Park Corby. The site lies over a former ironstone quarry and each building plot has been surcharged to comply with...

read more
Magna Park Lutterworth

Magna Park Lutterworth

GLP - Magna Park LutterworthMagna Park LutterworthOur team has been involved in the design of infrastructure and earthworks at Magna Park Lutterworth since the mid-1990s and has an ongoing involvement with geotechnical aspects for warehousing plot developments. Our...

read more
Panattoni, Haydock 66

Panattoni, Haydock 66

Panattoni - Haydock 66Panattoni - Haydock 66The development comprised of a 66,000 sq. ft unit, completed in 2026. Engineering design included significant mineworking stabilisation, enabling earthworks and retaining walls. Key Engineering Challenges Flood mitigation...

read more
Firethorn Bardon

Firethorn Bardon

Detailed geotechnical design for the Bardon 3 Industrial and Logistics park.

Materials associated with neighbouring quarries necessitated detailed settlement and stability assessment of the earthworks and retaining structures, as well as ground improvements in collaboration with our structural and civil engineering teams.

read more
Graftongate Pickford Gate, Coventry

Graftongate Pickford Gate, Coventry

Geotechnical engineering design services for a 15 hectare development.

Burrows Graham geotechnical scope included global stability analysis, design of soil reinforcement systems and detailed earthworks verification.

read more
PLP South Caldecotte, Milton Keynes – Geo

PLP South Caldecotte, Milton Keynes – Geo

PLP - South Caldecotte - Milton KeynesPLP - South CaldecotteBurrows Graham has completed civil, structural, highways and geotechnical design for the first phase of development for PLP. The first phase comprised 10 warehousing units with total floor area of 1.06...

read more
West Midlands Interchange

West Midlands Interchange

Ongoing development of circa 8m sqft of warehousing with rail terminal.

Burrows Graham were responsible for the design of the sitewide infrastructure including geotechnical design and on-site monitoring of earthworks, retaining walls, mounds and ground improvement.