Panattoni – Haydock 66

Panattoni – Haydock 66

The development comprised of a 66,000 sq. ft unit, completed in 2026. Engineering design included significant mineworking stabilisation, enabling earthworks and retaining walls.

Key Engineering Challenges

  • Flood mitigation measures former adjacent to the watercourse
  • Diversion of an existing Severn Trent water foul water rising main
Project Name: Panattoni – Haydock 66
Architect: UMC
Contractor: TanRo
Sector: Industrial and Logistics